05 November 2018

Production of biogas in Linköping started in 1997, and in 2017 Tekniska verken produced 120 GWh of energy from biogas, equivalent to 13 million litres of petrol, in the largest biogas facility in Sweden.

Biogas Photographer: Niklas Virsen
It all started in Linköping in 1997 when too much organic material was entering the waste-water treatment, waste products from the abattoir in Linköping required complicated treatment, and buses were spreading particles in the air and causing diesel smog in the city centre.

Since 2012, the municipality-owned Tekniska verken has collected food waste in green plastic bags, which are handled together with the normal household waste. They are automatically sorted at Gärstad, and subsequently transported to the biogas facility.

Returning important nutrients

“We receive nearly 100,000 tonnes of organic waste from the food industry and households every year. This is converted to biogas and biofertilizer, which return important nutrients such as phosphorus and nitrogen to neighbouring fields”, says Sören Nilsson Påledal, process engineer at Tekniska verken.

gröna påsen Gärstadverken  foto GÖRAN BILLESON Photo credit Göran Billeson In addition, 20 GWh of biogas energy is produced each year from digesters at the municipal sewage treatment plant, part of the waste-water treatment system.

In the digestion chambers at Tekniska verken, the organic material is broken down in an oxygen-free environment at approximately 42 °C. The material remains in the digester for an average of 50-60 days. The gas, which consists of 65% methane and 35% carbon dioxide, is then passed to an upgrade facility where the carbon dioxide is removed, giving a gas with 97% methane.

This gas is distributed and sold by Svensk Biogas, a subsidiary to Tekniska verken. Svensk Biogas currently has 12 filling stations in the region, in Mjölby, Motala, Västervik, Norrköping and Linköping.

Liquid biogas

The board at Tekniska verken recently decided to build a facility for liquid biogas, which is particularly suitable for freight transport on land and at sea, and can be transported and stored more efficiently. This required an investment of SEK 68 million, where approximately SEK 30 million is a grant from Klimatklivet, an initiative from the Swedish Environmental Protection Agency.

The investment in biogas is characterised by political unity in Linköping, and its initial phase was made easier in that all the links in the chain – waste, water, heat and public transport – were under the responsibility of the municipality.

Translation George Farrants

Linköping, Uppsala and Västerås

BRC

Latest news from LiU

A couple of men standing next to each other in front of a blackboard.

Scientists mimic heart muscle cells with conductive plastic

For the first time, scientists have succeeded in artificially mimicking the ion signalling of heart muscle cells. To succeed, researchers at LiU have used organic electronics. The findings open up for new types of implants and sensors.

A men and his reflecetion near a brick wall.

Lubunca – a powerful language of hidden words

What can a hidden language tell us about freedom, identity and survival? By studying Lubunca, Burak Alp Çakar explores the emancipatory power of words and how they can empower, protect and keep communities alive.

En person som lagar mat över öppen eld.

SEK 6 million grant for LiU research on air pollution

Joyanto Routh has been awarded nearly SEK 6 million from Formas for research on air pollution, health risks and climate‑adapted solutions in Sweden and India.